3rd Street Tunnel | Phase II
15270
page-template-default,page,page-id-15270,ajax_fade,page_not_loaded,,qode-theme-ver-6.5,wpb-js-composer js-comp-ver-4.4.3,vc_responsive

Phase II

 

(September 25 – February 6, 2015)
During Phase II, crews will advance their work at the intersection of 3rd and H Street, which will be closed temporarily during this phase, and both vehicular and pedestrian traffic will be detoured around the area.

Traffic traveling south bound on 3rd street will not be able to continue onto H Street, connecting to Mass Ave. Those travelers will be redirected to use 4th Street for southbound travel.

Additionally, traffic will be shifted back to the original H Street alignment, allowing vehicles traveling westbound along H St to continue onto H St between 3rd and 4th Streets or continue southbound onto 3rd St.

Travelers attempting to continue eastbound on H Street will be directed to continue onto Mass Ave, and utilize the left turn lane onto 2nd street, in order to continue traveling eastbound on H St.